Model-200 Test Sieve Shaker Operation Instruction

2019-10-09

GENERAL SAFETY PRACTICES

WARNING:

1.Prior to operate the laboratory test sieve shaker , please make sure all the components are fastened, no broken on the sieves, no damage on the machine, electrical cables are connected properly.
2.Power supply is the same as shown on the 
test sieve machine plaque.
(Tolerance for voltage is ± 10%)
3.Keep all parts in place at all times to avoid exposure to parts rotating at high speeds. While the power of 
 laboratory test sieve shaker is on, severe injury can occur if hands or feet reach inside the unit.
4.When installing or maintaining this test sieve shaker, shut off and lock out power. Follow all local and national electrical codes. Failure to do so could result in severe personal injury or property damage.
5.Higher amplitudes occur during shut down and start-up 
laboratory test sieve shaker. Stand clear of unit and keep accessory equipment away during these cycles.

CAUTIONS:

1.Securely tighten all nuts and bolts on the unit. Pay special attention to the motor mounting bolts. If a motor vibrates loose, damage to the power cord and to the structure may result as well as risk of personal injury.
2.Do not operate instrument with more than quantity of weight we recommended. Overloading the top and bottom weight assemblies will place excessive load on motor bearings which can cause permanent damage to the motor and to the instrument.
3.Never run motor with weights exposed. Failure to do so could result in severe personal injury or property damage.
4.Screens are fragile. Handle with care. Never place tools or parts on the screen or damage to screen may occur.
5.The noise level produced by this equipment may not be acceptable to your environment. Take every precaution to make certain that safe noise levels are met.

PREPARATION AND OPERATION
:

Preparation
A. Place sieves with required mesh onto the machine base sequentially.
B. Feed raw material on the top sieve, and then close the lid.
C. Adjust the height of rubber nut accordingly and fasten the knobs.
D. Tighten the two black rubber nut and black knobs to secure the lid.

Operation
A. When power supply is on, the red power indicator comes on.
B. Set the timer
C. Switch the start button, the green indicator comes on and machine starts working until the setting timing is up.

PLEASE NOTE:

Before using
A. Place sieves with required mesh onto the machine base sequentially.
B. Feeding raw material on the top sieves, and then closes the cover.
C. Tighten the hand shank and tight handle to fix the related parts.

Using
A. Plug the power cord into the socket
B. Setting the required time
C. Switch the start button and the unit starts to work until the setting time is up.
D. Switch the button to stop the machine during the working process as needed or reset the time as needed.

After using
A. Turn off the power
B. Clean the screen after operation, place the machine in the right place

Note
A. Turn off the power  when test sieve is not in use for an extended period of time.
B. Clean the screen after operation, so they will be ready for use next time.
C. Do not splash water on the machine to avoid current leakage.
D. Turn the machine off immediately in the event of unusual noises and inspect for blockage or other irregularities.
E. Always ensure the hand shank and tight handle are securely tightened before operation.
F. Control vibration force as needed by increase or decrease the balance weight on vibration motor.